The risk concept and its application in natural hazard risk

Transcript Of The risk concept and its application in natural hazard risk

Nat. Hazards Earth Syst. Sci., 9, 801–813, 2009 www.nat-hazards-earth-syst-sci.net/9/801/2009/ © Author(s) 2009. This work is distributed under the Creative Commons Attribution 3.0 License.

Natural Hazards and Earth
System Sciences

The risk concept and its application in natural hazard risk management in Switzerland
M. Bru¨ ndl1, H. E. Romang1, N. Bischof1, and C. M. Rheinberger1,2 1WSL Institute for Snow and Avalanche Research SLF, Davos, Switzerland 2IED Institute for Environmental Decisions, ETH Zu¨rich, Switzerland
Received: 21 October 2008 – Revised: 19 May 2009 – Accepted: 19 May 2009 – Published: 27 May 2009

Abstract. Over the last ten years, a risk-based approach to manage natural hazards – termed the risk concept – has been introduced to the management of natural hazards in Switzerland. Large natural hazard events, new political initiatives and limited financial resources have led to the development and introduction of new planning instruments and software tools that should support natural hazard engineers and planners to effectively and efficiently deal with natural hazards. Our experience with these new instruments suggests an improved integration of the risk concept into the community of natural hazard engineers and planners. Important factors for the acceptance of these new instruments are the integration of end-users during the development process, the knowledge exchange between science, developers and end-users as well as training and education courses for users. Further improvements require the maintenance of this knowledge exchange and a mindful adaptation of the instruments to case-specific circumstances.
1 Introduction
Over the last ten years, integrated approaches to manage natural hazards have been developed in Switzerland (PLANAT, 2005; Ammann, 2006) and other European countries (e.g., Jonkman et al., 2008; Merz and Emmermann, 2006). Common denominator of these approaches is the understanding of natural hazard management as a threefold task (Kaplan and Garrick, 1981): (I) the analysis of risk, (II) the evaluation of risk, and (III) the finding of appropriate mitigation strategies sometimes referred to as management of risk. Such a threefold conception of risk, hereafter called the risk concept, was first developed as a decision support framework for dealing
Correspondence to: M. Bru¨ndl ([email protected]f.ch)

with complex technical systems such as nuclear power and chemical industry facilities (see Starr, 1969). In the 1980s and 1990s, the risk concept was introduced to the management of natural hazards in order to quantify the degree of hazard. In Switzerland, results of the research program “Risk and Safety” (1990–1995) were the starting point for various publications and instruments (e.g., Merz et al., 1995), which were subsequently transferred to the field of natural hazards (e.g., Heinimann et al., 1998; Hollenstein, 1997). Further, publications by the public authorities provided guidelines and recommendations on how natural hazards should been accounted for in sustainable land use planning (BFF and SLF, 1984; Loat and Petrascheck, 1997; Lateltin et al., 1997). Towards the end of the nineties, based on the work of Wilhelm (1997), two federal guidelines presenting practical oriented methods for the risk analysis of gravitational natural hazards and the economic optimisation of mitigation measures were published in Switzerland (Borter, 1999; Borter and Bart, 1999; Wilhelm, 1999). On the international level, the results of the International Decade for Natural Disaster Reduction (IDNDR) paved the way for an increasing awareness of natural hazard risks and several authors considered the risk concept as a key component for dealing with natural hazards (e.g., IUGS, 1997).
Natural hazard practitioners such as foresters, civil engineers and civil protection officers quickly realized that these new methods for risk analysis (Borter, 1999; Borter and Bart, 1999; Wilhelm, 1999) required a large amount of data that was often not available. Therefore, an additional method was developed, which include the analysis of hazards on existing data as well as expert judgements and local experiences gained in workshops with experts, practitioners, and regional representatives of the population. Based on this so-called “pragmatic approach” (Ba¨hler et al., 2001), the Swiss Federal Office for Civil Protection in collaboration with the Swiss Federal Office for the Environment developed an e-learning platform and a calculation tool provided

Published by Copernicus Publications on behalf of the European Geosciences Union.

802

M. Bru¨ndl et al.: Natural hazard risk management in Switzerland

Risk Analysis

Risk Evaluation

Definition of goals, description of system, data acquisition and preparation

Hazard Analysis

Exposure Analysis

Concequence Analysis

Individual Risk Risk Calculation Societal Risk

check of individual risk Individual Risk

Societal Risk without
Risk Aversion

Risk Aversion
Societal Risk with
Risk Aversion

negative

Identification of mitigation measures

Cost

Effectiveness

Check of protection goals individual risk

Evaluation of mitigation measures - economic criteria - ecological, social criteria
positive
Suggestion of protection strategy

Check of protection goals societal risk
1

Planning and evaluation of mitigation measures

Fig. 1. Illustration of the risk concept.

on a CD-ROM that allows for a simplified risk analysis (BUWAL, BABS, BWG, 2005). The success of this tool and its broad use in the education of students and practitioners in Switzerland and abroad (e.g. the tool was translated into Thai) led to the development of the online-software “RiskPlan 2 Online”. Risk-Plan 2 Online can after registration at www.riskplan.admin.ch be freely accessed. The background and the general setup of this tool, which is available in German, French, English and Chinese, are presented in FOEN and FOCP (2008) and Bru¨ndl et al. (2009).
In 1999, several severe natural hazard events occurred in Switzerland (Wilhelm et al., 2000; Bru¨ndl and Rickli, 2002), which triggered the further development of refined approaches and instruments for the risk based planning of natural hazard mitigation. Under the impression of these hazard events that had cost more than CHF 3 billion, the Swiss government commissioned the National Platform for Dealing with Natural Hazards PLANAT (in German, “Plattform Naturgefahren”) and assigned it the mandate to develop a vision and a strategy for dealing with natural hazards in the future (PLANAT, 2005). This strategy is based on the risk concept and aims at an optimised allocation of financial resources by reducing risk with a given relation of risk reduction cost, also called the marginal-cost criterion (Bohnenblust and Slovic, 1998; Ammann, 2006; Bru¨ndl et al., 2006; Fuchs et al., 2007). Among other open issues the strategy has suggested to develop a guideline, which illustrates the application of the risk concept to common natural hazards in Switzerland. This guideline, which has been developed over

the last two years under the name “RIKO”, will be presented in the next section of this paper.
Changes in the Swiss subsidy system, that came into operation with the 1st of January 2008, forced the Federal Office for the Environment and the Swiss cantons, as responsible legal bodies for the protection against natural hazards, to prioritise among mitigation projects in order to respond to limited financial resources. Therefore, they initialised in 2006 the development of a project assessment tool, which would allow prioritising among natural hazard mitigation projects according to their cost-effectiveness. This approach is well in line with the development in other Alpine countries, where decision support tools are developed and introduced into practice (e.g, BLFUW, 2006, 2009; Gamper et al., 2006). This project assessment tool, named “EconoMe”, will be presented in the third section of this paper. We will demonstrate the application of the tool by a case study example to ease the understanding of the workflow.
First experiences with earlier guidelines by Borter (Borter, 1999; Borter and Bart, 1999) and Wilhelm (Wilhelm, 1999) showed that the acceptance and particularly the subsequent application by the practitioners have been limited and that these guidelines have so far not been applied in a consistent manner. The results of risk analyses with these guidelines were not comparable to each other (Winkler, 2002, 2003). These experiences suggest that a target-oriented and pragmatic introduction of the new tools is the most important point of successful risk assessment tools. A third goal addressed in the fourth section of this paper is therefore to

Nat. Hazards Earth Syst. Sci., 9, 801–813, 2009

www.nat-hazards-earth-syst-sci.net/9/801/2009/

M. Bru¨ndl et al.: Natural hazard risk management in Switzerland Structure of guideline RIKO

803

report on the development of these instruments and to discuss the process of their introduction to the community of natural hazard practitioners.

General presentation of the risk concept (Part A)

Case study avalanche Case study flood Case study debris flow Case study rock fall Case study spontaneous landslide Case study permanent landslide Case study storm Case study hail Case study heatwave Case study earthquake

2 The guideline RIKO
2.1 Introduction
RIKO provides a documentation of the theoretical background and a guideline to the practical application of the risk concept (Fig. 1), which serves as the basis of the Swiss National Strategy against Natural Hazards (PLANAT, 2005). The guideline consists of two parts (Fig. 2). Part A of the guideline presents the risk concept in general and serves as the theoretical backbone that facilitates the knowledge required for the adequate use of the risk assessment tool EconoMe. In Part B, peculiarities of different natural hazard processes are described and their inclusion into the risk assessment and the evaluation of mitigation measures is exemplified by corresponding case studies for all hazard processes (Bru¨ndl, 2009).
The heart of the guideline is a very detailed step-by-step procedure for the risk-based planning and evaluation of natural hazard mitigation projects, which consists of three steps: the risk analysis task, the risk evaluation task and the risk management task (Fig. 1). Following Kaplan and Garrick (1981), the risk concept is meant to answer the following guiding questions: “What can happen?”, “What may happen?” and “What needs to be done?”. In the following subsections we will specify what we mean by these questions.
2.2 Risk analysis
2.2.1 Hazard analysis
The key element of each risk analysis is the hazard analysis. Basic information upon the hazard process can be taken from terrain analysis, topographic and geological maps, aerial photographs and satellite images as well as from event inventories and historical chronicles. The physical impacts of the hazard are derived from a process analysis, which can be enhanced by physical modelling. The results of the hazard analysis are displayed in intensity maps for each hazard scenario, which indicate at which locations a certain physical impact (e.g., pressure, velocity or inundation depth) is to be expected during a reference period.
2.2.2 Exposure analysis
In the exposure analysis persons and assets at risk are identified and their number, type, value and probability of exposure is assessed. Exposure varies with different types of objects, which can be either permanent (e.g. buildings) or mobile (e.g. persons on traffic routes). The probability of exposure for persons in buildings is defined by the number of

Fig. 2. Content of the guideline RIKO.

hours per day that these persons are present in the building, e.g., for 18 h p(e)i=0.75. The probability of exposed persons in mobile objects p(et) (e.g., in cars) is determined by the traffic frequency on roads or railways (MDT ), the velocity of vehicles v and the length of the endangered traffic line sections g following p(et)=(MDT ×g)/v (Rheinberger et al., 2009). The number of persons in objects varies in different exposure situations (e.g., fully booked or empty hotel). The consideration of different exposure situations allows accounting for risk peaks.

2.2.3 Consequence analysis

The consequence analysis combines the hazard and exposure analysis yielding the expected damage or loss including all considered scenarios. In each scenario, the expected loss is calculated individually for every object at risk. In a second step, the expected loss in this scenario is obtained by summing over the expected loss of the individual objects. Generically, the expected loss of lives A(N ) in exposed buildings is calculated as:

A(N )i,j,k = p(s)j × p(e)i,k × Ni,k × λi,j

(1)

where A(N )i,j,k = expected loss of object i in scenario j and exposure situation k; p(s)j = spatial probability of the process in scenario j ; p(e)i,k = probability of exposure of the object i in exposure situation k; Ni,k = number of persons exposed in object i in exposure situation k; and λi,j = mortality rate of persons exposed in object i due to the impact in scenario j . If injured persons are considered, the mortality rate has to be replaced by a factor reflecting the probable degree of injury at a defined intensity of the process. Both values can be derived from experiences of comparable events in the past.
The total loss A(N )j of scenario j is then calculated by:

A(N )j =

A(N )i,j,k

(2)

ki

www.nat-hazards-earth-syst-sci.net/9/801/2009/

Nat. Hazards Earth Syst. Sci., 9, 801–813, 2009

804

M. Bru¨ndl et al.: Natural hazard risk management in Switzerland

2.2.4 Calculation of risk

The risk to a group of persons or objects in the hazard area under investigation is referred to as societal risk. It represents the damage or the fatalities that are statistically expected due to the hazard impact in scenario j and is calculated as the product of the expected damage in a scenario j and the frequency of this scenario according to:

Rj = pj × A(N )j with pj = Pj − Pj+1

(3)

with Rj = societal risk of scenario j ; pj = frequency of scenario j ; Pj = exceedance probability of scenario j and Pj+1= exceedance probability of scenario j +1; A(N )j = expected loss of scenario j . Finally, the total societal risk R can be
obtained by summing over all scenarios:

R = Rj

(4)

j

The individual risk for persons in highly endangered objects is also looked at. This individual risk expresses the probability for the individual i to die during a reference period (mostly one year) by the specific hazard scenario j . It is calculated by:

rij = pj × p(s)j × p(e)i × λi,j

(5)

and the total individual risk to an individual i is then:

ri = rij

(6)

j

with rij = individual risk of person i in scenario j ; pj = frequency of scenario j ; p(s)j = spatial probability of the process in scenario j ; p(e)i= probability of exposure of person i; λi,j = mortality of person i in scenario j ; ri= individual risk of person i.

2.3 Risk evaluation

The societal and the individual risks are compared with predefined safety goals for both risk types (PLANAT, 2005). The individual risk is controlled for whether it complies to the prescribed thresholds. The basic idea behind such thresholds is that the probability of death due to a natural hazard risk beyond self-control should not be higher than 1% or more of the lowest risk of death within a society (VROM, 1988). For Western societies, these thresholds are in the probability range of 10−5/year to 10−6/year (see Jonkman et al., 2003, for an overview). The Swiss strategy “Dealing with natural hazards” (PLANAT, 2005) suggests safety goals no higher than 4×10−6 The evaluation of societal risk is based on the concept that risk can be reduced at proportional cost of mitigation measures (Ammann, 2006; Bru¨ndl et al., 2006). “Proportional cost” denotes a relation of risk reduction expressed in monetary units and the yearly cost of mitigation measures. Persons

are monetised by the value of statistical life (VSL), which expresses the amount of money a society is willing to pay for averting a fatality (see Hammitt, 2000, for an overview). In Switzerland, we use VSL-values between CHF 5 and 10 million per prevented fatality (PLANAT, 2005). This value corresponds well with VSL values found in the economics literature (Baranzini and Ferro Luzzi, 2001; Leiter and Pruckner, 2008).

2.4 Planning and evaluation of mitigation strategies

The goal of any risk assessment is to find an appropriate risk mitigation strategy. Starting from the initial risk, all costeffective measures or combination of measures are evaluated in a stepwise procedure (Fig. 3). By adding risk reducing measures to previous measures and by drawing the amount of risk reduction of measures (effectiveness) and their yearly expected costs into a diagram, the risk-cost diagram can be derived. The evaluation of effectiveness (i.e. the technical feasibility to reduce risk) is based on the analysis of expected consequences after having realised distinct mitigation measures. The costs of mitigation measures C(y) are assessed as annuity value of the initial investment I (0), the annual costs for maintenance C(m) and operation C(o), a residual value L(n) after the lifetime n and an interest rate p for discounting this annuity value following Wilhelm (1999) (Eq. 7):

I (0)−L(n) I (0)+L(n) p

C(y)=C(m)+C(o)+

+

×

(7)

n

2

100

In the risk-cost diagram the optimal mitigation strategy can be graphically derived at the tangent point of the risk-cost curve and the marginal-cost criterion line (Fig. 3). The slope of this marginal-cost criterion line equals the ratio of the amount of risk reduction and the associated costs. If the risk is monetised (units of risk reduction and annual cost of measures are the same, e.g. Euro per year), the slope of the marginal-cost criterion line β should be equal to −1 or steeper. In other words: R/ C≥1 with R being the risk reduction provided by a specific mitigation strategy and
C being the associated costs of this strategy (Bohnenblust and Slovic, 1998; Bru¨ndl et al., 2006; Fuchs et al., 2007).

2.5 Implementation process of the guideline

The stepwise structure of the guideline was chosen (I) as it follows the established risk concept and (II) as it is believed that this workflow enables practitioners with different educational backgrounds to conduct risk assessments based on a comparable standard. Hence, the target audience of this guideline are experts in all kind of natural hazards, who work mainly with private companies but might also be staff members of the responsible cantonal and federal authorities. Our experiences made during the development of the guideline show that this methodology provides a common mean for assessing all kind of natural hazard processes in Switzerland,

Nat. Hazards Earth Syst. Sci., 9, 801–813, 2009

www.nat-hazards-earth-syst-sci.net/9/801/2009/

M. Bru¨ndl et al.: Natural hazard risk management in Switzerland

805

although the state of process knowledge and understanding varies from hazard to hazard.
The goal of the guideline, providing a comprehensible documentation of assumptions and methods for complex risk assessment and evaluation of mitigation measures for all kinds of natural hazards, requires defining process specific and site specific values like e.g. the vulnerability of building types or the mortality rate of persons in these buildings. The structured procedure outlined in the guideline serves as basis for the development of software tools, like the tool EconoMe presented in the next section.
3 The online-tool EconoMe
3.1 General setup of the tool
EconoMe is an online-tool (BAFU, 2009), which can be accessed by authorised users (e.g., experts of engineering companies), who are involved in the planning of mitigation projects subsidised by cantonal and federal resources. The new regulation for subsidy of mitigation measures against natural hazards in Switzerland requires that projects with an investment scope of more than CHF 1 million (∼ EUR 650 000) are proofed to be cost-effective. The Federal Office for the Environment uses EconoMe for prioritising among mitigation projects and projects initiated after the 1st of January 2008 have to be assessed by the use of EconoMe.
The workflow of risk assessments in EconoMe follows the risk concept as it is described in the above section (Sect. 2, Fig. 1). The user is guided step-by-step through the risk analysis task, the risk evaluation task and the evaluation of an analysed mitigation project by its cost-effectiveness. The mandatory working procedure consists of the following steps:
1. initialisation of the project;
2. description of the investigated site;
3. hazard analysis and definition of scenarios;
4. determination of the damage potential;
5. consequence analysis before mitigation;
6. calculation of individual risk before mitigation;
7. definition of mitigation measure(s);
8. consequence analysis after mitigation;
9. calculation of individual risk after mitigation;
10. comparison of risk reduction and cost and finalisation of the assessment.

Monetary Societal Risk [CHF/year]

Initial Risk

Optimal Risk Reduction strategy

Alternative Mitigation Measures

∆R ∆C

Marginal-Cost-Criterion

Risk-Cost Curve

Cost of Risk Reduction Measures [CHF/year]

Fig. 3. Exemplary risk-cost diagram which illustrates the optimisation of mitigation measures by using the marginal-cost-criterion. Where the tangent touches the risk-cost curve the economical optimised combination of measures under the given assumptions is suggested (according to Bohnenblust and Slovic, 1998).

The risk analysis (steps 3, 4, 5, and 6) is based upon intensity maps of the investigated process for different scenarios (e.g., 30-, 100-, and 300-year return periods according to Swiss guidelines (BFF and SLF, 1984; Loat and Petrascheck, 1997; Lateltin et al., 1997)). The considered scenarios are fixed in agreement with the contracting authorities and the intensity maps are created aside from EconoMe. Exposed objects are identified individually. The potential damage is determined for every single object as a product of the overlay of the intensity maps with exposed objects considering the spatial probability of the process, the probability of exposure of an object, the number of exposed persons or the value of exposed objects, and the vulnerability of objects or the mortality rate of persons, respectively, according to Eq. (1); identical objects can be summarized to object groups. The values for the vulnerability of objects, the mortality rate of persons and the spatial probability of processes are predefined in the tool and cannot be changed by the user. This guarantees that users rely on the same basis values in their risk assessments and it facilitates the comparison between mitigation projects for only one site and among different sites by the subsidising authorities. In the actual version of EconoMe only the structural vulnerability of objects is considered and other components like socio-economic vulnerability is excluded. The monetary values of objects are also predefined, but can be adapted to regional or site-specific characteristics. However, changing the input values must be referenced and are documented in the program.
The total risk is calculated by integrating the potential damages over all objects, all exposure situations and all considered scenarios following Eqs. (2), (3), and (4). The calculated risk, denoted as societal or collective risk, is based on the assumption that no mitigation measures are taken. Beside the societal risk, the individual risk is calculated for

www.nat-hazards-earth-syst-sci.net/9/801/2009/

Nat. Hazards Earth Syst. Sci., 9, 801–813, 2009

The Chummerbach is a torrent prone to debris flows near Davos in southeast Switzerland

(Fig. x1x). A previous case study on this torrent (Romang et al., 2000) provides excellent data

806

that can be used for the application and testinMg o. fBthru¨enrdislkectoanlc.:epNt antudr,ainl hpazrtaicrdularirs, kofmthaenagement in Switzerland

tool EconoMe.

Figure x1x: Overview on the catchment

Fig. 4. Overview on the catchment “Chummerbach”, Davos; (c) 2008 swisstopo (JD082774). 1. Initialisation of the project

On 15 August, 1998, a local storm event with a total precipitation of approximately 100 mm

all objects in whichwpitehrisno2nsh (aarcecoprdreinsgentot.raiVnfaallulersadoarf mineadsiu-rementsAbyftMeretehoeSwdeisvse)ltoripgmgeernetd ahneadvyteesrtoinsigonphase, EconoMe was

vidual risks above 1×in1C0h−u4mmareerbiancdhicleaateddingintoreddeb, rvisaflluoewssbwei-th a toitnaltrvoodluumceedofto50t0h0e0 emn3d. -Tuhseedrsebdriusrfilnogw several one-day educa-

tween 1×10−4 and 1d×ep1o0s−it6ioanrseasinwdeicllaatesdthiensuybeslleoqwuenatnfdlovoadli-ng andtieornosaionndotnratihneinalglucvoiaulrfsaens.caTuhseisd wseavserceonsidered to be one es-

ues

below

1×10−6

damage to buildings, traffic lines, and agriculture, which summed up to CHF 4 million (~2.5
are marked in green colour as an indica- sential part of the development process.

Since

March

2008,

million Euro). This event initiated in-depth studies of the hazards and risks associated with

tor whether the protedcetbiroisnflgoowaslsassuwgeglleassteodf rbisyk mthietigNataitoinonmaelasuresE. conoMe has been used by practitioners and feedback on

strategy are violated or not (PLANAT, 2005; Bru¨ndl, 2009). the usability of the tool has so far been positive. Particularly,

After this step, bo2t.h Dtyepscersipotfiornisokf athre icnavlecsutligaatetdedusnitdeer con- the structured application has been commended and this is

sideration of the regTarhdeeadllumviiatilgfaantioisndommeiansauterdesby(satgerpiscu7lt,ur8a,l use. Iitlliussrtartahteerdspianrstehley pnoepxutlasteecdti(oFnig.bxy1xa),case study example that 9). The annuity costessopefcmialiltyigianticoonmpmaeriassounrteosthaerenecaarlbcyultaotwend of Daavsosse.sTshees cthatechrimskenotfaaretaoorrfe6nktmpr2oisne to debris flows and floods.

according to Eq. (7) (cWovielrheedlm,ai1n9ly99by).pastures. Further, the lower part of the catchment is covered by forests and

The result of a riskthaesusepspsemr peanrtt bcyonroscisktss(oFfigt.hxe1bxe).nTehfiet-acvoesrtage height of the catchment is approximately 2300 ratio, whereby the bemneafislt, iasndastshuemsleodpetsoaesqwuealll tahsethreisckharendneulca-re incl4inedAbpyp2l5ic%atoionnanoafveEracgoen. TohMe echa–nncealsoef study “Chummertion (step 10). Only tmheittiograretniot nfopllroowjescatsgetohlaotgihcaavl eboardbeer:ntehfietr-ight-hand bsiadcehis”dominated by limestone
formations with karst phenomena and remarkable scree slopes, whereas the left-hand side has
cost ratio ≥1 are consseidveerraeldPbereminiagncaonsdt-Terfifaescstiicvsee.dIimn eonrtdsewr ittoh variable hydrogeological and geotechnical improve the handlingproopfetrhtieest,ocoolv,erthede msyossttleymbyamutoormainaetisc.aAllsya consTeqhueenCcheuomf tmhiesrgbeaoclhogiicsalasetottrinregn, tslopproene to debris flows near

documents the assumptions made and the results of each risk Davos, in the south-east of Switzerland (Fig. 4). A previ-

assessment in a pdf-file.

ous case study on this torrent (Romang, 1999a,b) provides

excellent data that can be used for presenting the structured

3.2 Implementation process of the tool

risk assessment and the evaluation of cost-effectiveness of

mitigation measures.

EconoMe is an advancement of an existing tool to assess

the cost-effectiveness of mitigation projects based on earlier 4.1 Initialisation of the project

guidelines published by the Federal Office of the Environ-

ment (Borter, 1999; Borter and Bart, 1999). Because the On the 15th of August 1998, a local storm event with a total

target group of EconoMe are natural hazard experts in con- precipitation of approximately 100 mm within 2 h (accord-

sulting companies and staff members of cantonal and fed- ing to rainfall radar measurements by MeteoSwiss) triggered

eral authorities, representatives of these user groups were involved in all phases of the development and the deployment

heavy erosion in the Chummerbach channel leading to debris flows with a total volume of 50 000 m3. The debris flow

of EconoMe within a project expert group. Frequent meet- deposition as well as the subsequent flooding and erosion on

ings with this project expert group ensured that the software the alluvial fan caused severe damages to buildings, traffic

addresses the needs of the relevant actors and target groups. lines and agriculture, which summed up to CHF 4 million

Nat. Hazards Earth Syst. Sci., 9, 801–813, 2009

www.nat-hazards-earth-syst-sci.net/9/801/2009/

M. Bru¨ndl et al.: Natural hazard risk management in Switzerland

807

(∼ EUR 2.6 million). This event initiated in-depth studies of the hazards and risks associated with debris flows as well as of appropriate mitigation strategies.
4.2 Description of the investigated site
The alluvial fan of the Chummerbach torrent is dominated by agricultural use. It is rather sparsely populated (Fig. 4), especially in comparison to the nearby town of Davos. The catchment area of 6 km2 is covered mainly by pastures. Further, the lower part of the catchment is covered by forests and the upper part by rocks (Fig. 4). The average altitude of the catchment is approximately 2 300 m a.s.l.; 80% of the area is inclined between 10 and 40%, with an average of 25%. The channel of the torrent follows a geological border: the orographical right-hand side is dominated by limestone formations with karst phenomena and remarkable scree slopes, whereas the left-hand side consists of Permian and Triassic sediments with variable hydrogeological and geotechnical properties, covered mostly by moraines. As a consequence of this geological setting, slope instabilities are widespread on the left-hand side. In the 1998 event, these slopes contributed significantly to the debris load in the channel.
4.3 Hazard analysis and definition of scenarios
The hazard assessment was carried out on the basis of the Swiss recommendations for flood hazard mapping (Loat and Petrascheck, 1997). Three scenarios with different statistical return periods were defined (Table 1). The peak discharge was estimated by using different well-established estimation formulas (BWG, 2003). The potential volumes of debris flow scenarios were defined by an intensive field assessment that considered the general geomorphological features in the catchment and the channel as well as the results of the analysis of the 1998 event. The probability of the different scenarios was set on the basis of a back calculation of the 1998 event. By comparing the characteristics of this event with basic information such as the statistical analysis of precipitation data from the nearby gauging stations or the scarce information on past events, the statistical return period of the event was estimated to be at least 100 years.
On the basis of the defined scenarios, intensity maps were created illustrating the degree of hazard for standard return periods (Fig. 5). The intensity zones were delineated regarding the geomorphology of the alluvial fan and the mapping of the 1998 event. Models such as Flo-2D (O’Brien et al., 1993) were not yet commonly used at that time and were therefore not applied to Chummerbach.
4.4 Determination of the damage potential
The damage potential within the endangered area on the alluvial fan was limited to:

Table 1. Water discharge and debris volume expected at the fan for three defined scenarios in Chummerbach.

statistical return period [y]
30 100 300

peak discharge [m3/s]
13 18 24

total volume of debris [m3]
20 000 40 000–45 000 50 000–60 000

– 21 buildings (a restaurant, residential buildings, and agricultural buildings);
– 1.5 km of roads (in particular, a principal road crossing the fan on its lower end);
– 0.7 km of a railway (with limited traffic); and
– 20 hectares of agricultural land.
These objects were classified directly in the field, and their values were obtained from predefined values in EconoMe, summing up to a total of CHF 22 million.
The average total number of exposed persons in all buildings was 65. It was supposed that people would be present in the buildings for 18 h a day, which resulted in a probability of presence of 0.75. In order to calculate the exposure of persons on roads and in trains, different parameters such as the daily frequency of traffic, the velocity of the vehicles, and the length of the endangered sections were estimated.
4.5 Consequence analysis before mitigation
The expected losses were calculated by combining the hazard and exposure analysis for each scenario. In addition, permanent objects were distinguished from mobile objects and material assets from persons. The vulnerabilities of the objects were obtained from EconoMe (Table 2). The expected losses summed up to CHF 1.4 million, 4.3 million, and 7.1 million for a 30-year, a 100-year, and a 300-year event, respectively. Finally, the frequency-extent diagram was derived from the expected losses and the frequency of the underlying scenarios. The total societal risk including all scenarios was calculated at CHF 86 000 per year, whereby the loss of lives was monetised with CHF 5 million per fatality, which is a standard value in Switzerland (Bru¨ndl et al., 2006).
Different hazard scenarios contributed similarly to the total societal risk. However, although the expected loss was considerably smaller in the case of a 30-year event than in the other cases, it contributed most to the total risk due to its higher probability. In frequent as well as in rare events, the damage to material assets was dominating. Overall, the risk for material assets was six times higher than the monetised risk for persons. Hence, it can be concluded that the societal risk for persons was rather low.

www.nat-hazards-earth-syst-sci.net/9/801/2009/

Nat. Hazards Earth Syst. Sci., 9, 801–813, 2009

808

M. Bru¨ndl et al.: Natural hazard risk management in Switzerland

(a)

C_i030_v.shp 0 weak intensity middle intensity strong intensity Perigkch.shp

(b)

C_i100_v.shp 0 weak intensity middle intensity strong intensity Perigkch.shp

(c)

C_i300_v.shp 0 weak intensity middle intensity strong intensity Perigkch.shp

Abbildung 1: Intensity maps for a 30-year, a 100-year, and a 300-year event, respectively.
Fig. 5. Intensity maps without considering measures for a 30-year (a), a 100-year (b), and a 300-year event (c), respectively.

4.6 Calculation of individual risk before measures
Individual risks were calculated for selected persons, who are supposed to have a higher probability of exposure to hazard events. The result showed that in a few buildings as ell as on highly exposed road sections the individual risks were considerably higher than 1×10−5, which is the upper threshold for involuntary individual risks in Switzerland (PLANAT, 2005).
4.7 Definition of mitigation strategies
Several mitigation measures were studied, focussing mainly on structural mitigation measures. Finally, the following six alternatives were analysed in detail:
1. Construction of a series of check dams in the middle reach of the channel in order to stabilise the bed and prevent further erosion;
2. Stabilisation of the banks and the slopes on the left-hand side in the lower reach of the channel in order to decrease slope movements and prevent further erosion;
3. Construction of a medium-sized retention basin (30 000 m3) at the fan apex in order to retain a considerable part of the debris load up to a 100-year event;
4. Local protection of the most exposed buildings in order to increase their resistance and protect the people inside;
5. Construction of a maximal-sized retention basin (50 000 m3) at the fan apex in order to retain almost all the debris up to a 300-year event;
6. Combination of a medium-sized retention basin and of local protection.

The effectiveness of all these alternatives in terms of risk reduction was analysed by using an approach outlined in Romang et al. (2003) for the assessment of structural mitigation measures. The result of this assessment are intensity maps. In addition, the cost of these alternatives was estimated on the basis of standard cost values for construction works, the expected lifetime of measures, and on empirical values for annual maintenance and repair costs.
4.8 Consequence analysis after mitigation
On the basis of the intensity maps (after mitigation), which were elaborated for all the alternatives mentioned above, we calculated the expected risks while accounting for the corresponding risk reductions brought about by the analysed mitigation alternatives. The risk reduction varied from 23% (alternative 4) to 93% (alternative 5) (Table 3).
4.9 Calculation of individual risk after mitigation
The calculation of the individual risk showed that all alternatives would reduce risks to a value below 1×10−5 that complies with the Swiss safety goals.
4.10 Overview of the risk reduction and costs and selection of the most appropriate mitigation strategy
The benefit-cost ratio, which has to be ≥1 in order to fulfil the economic criteria of EconoMe, was calculated for all mitigation alternatives described above (Table 3). The benefit was calculated as difference of societal risk without consideration of mitigation measures minus the societal risk considering mitigation measures. The annual cost of mitigation measures were calculated following Eq. (7).
This risk assessment clearly showed that risk mitigation strategies in the channel upstream (alternatives 1 and 2) don’t fit the the economic criteria in EconoMe. Further, local

Nat. Hazards Earth Syst. Sci., 9, 801–813, 2009

www.nat-hazards-earth-syst-sci.net/9/801/2009/

M. Bru¨ndl et al.: Natural hazard risk management in Switzerland

809

Table 2. Parameters for vulnerability and mortality rates for different intensities for the processes flood and debris flow. The values have been fixed based on experiences from comparable, past events. Source: www.econome.admin.ch.

residential buildings agricultural buildings restaurant road railway

vulnerability weak middle strong

0.02 0.2

0.3

0.05 0.3

0.4

0.02 0.2

0.3

0

0.01

0.1

0.5

0.8

1

flood weak

mortality rate middle

strong

2×10−7 5×10−7 2×10−7
0
0

2×10−5 3×10−5 2×10−5 1×10−10 8×10−9

6×10−4 4×10−4 6×10−4
0.001 1×10−8

residential buildings agricultural buildings restaurant road railway

debris flow

vulnerability

mortality rate

weak middle strong weak

middle

0.02 0.4

0.05 0.2

0.02 0.4

0

0.2

0.5

0.6

0.6 2×10−7 4×10−3

0.5 5×10−7 2×10−3

0.6 2×10−7 4×10−3

0.5

0

0.1

1

0

6×10−4

strong
0.06 0.05 0.06 0.4 0.01

mitigation measures (alternative 4) have the best benefit/cost ratio. The two different retention basins (alternatives 3 and 5) are similar with regard to their cost-effectiveness; the decrease in risk with an increase in the size of the basin is equalised by increasing costs. Hence, alternative 4 seems to be the most favourable solution. However, it should not be forgotten that uncertainties in the whole risk assessment procedure are quite remarkable and that probably not all of the differences in Table 3 are significant.
Finally, alternative 6 was realised in the field. Besides the fact that this is a cost-effectiveness solution, the two arguments that additionally supported this decision are the following: First, the risk reduction of alternative 6 (as well as that of 3 and 5) is considerably higher than that of alternative 4. Therefore, a considerably higher benefit can be achieved implementing alternative 6 rather than alternative 4. Second, the combination of measures in this example provides redundancy and additional safety.
This is a welcomed effect, because it helps to reduce uncertainties about the effectiveness of single mitigation measures. Alternative 6 is the only combination of measures in the analysed portfolio. Hence, the choice and implementation of alternative 6 is reasonable.
5 Discussion
The introduction of new methodologies into the community of natural hazard practitioners is a time-consuming process (White et al., 2001). At the end of the 20th century sev-

eral new instruments were issued by the federal authorities in Switzerland. The guidelines for hazard mapping were published in 1997. Only two years later, the first guidelines for risk analysis for practitioners were published. Investigations after three to five years indicated that these methods were either not used or that they were applied in an inconsistent manner, so that results from risk assessments could not be compared to each other (Winkler, 2003; PLANAT, 2005). Although, there were some instruments for risk-based planning available four years ago, investigations suggest that riskbased planning was not anchored in the community of natural hazard practitioners at that time (Hollenstein et al., 2004).
One of the reasons might be that risk based planning was not required by federal and cantonal authorities (Bischof et al., 2009). Another reason might be that these instruments were not sufficiently well introduced to practitioners. Other examples such as the current practice in avalanche warning (Bru¨ndl et al., 2004) show that education courses are an essential part in introducing new methods and techniques to the community of natural hazard practitioners. Education courses are one way of risk communication and may play a central role within integral risk management (IRGC, 2005).
A second reason for the less consistent way in which the instruments by Borter and Wilhelm (Borter, 1999; Borter and Bart, 1999; Wilhelm, 1999) were used might be, that they were not available as software tools. A pre-defined clear workflow as it is implemented in EconoMe allows a consistent application of the risk concept. Pre-defined values for the spatial probability, the vulnerability and the mortality rate for persons enable comparable results. The clear indication

www.nat-hazards-earth-syst-sci.net/9/801/2009/

Nat. Hazards Earth Syst. Sci., 9, 801–813, 2009

810

M. Bru¨ndl et al.: Natural hazard risk management in Switzerland

Table 3. Risk reduction and cost of six alternatives of structural mitigation measures in Chummerbach.

alternative
1: check dams 2: bank stabilisation 3: medium-sized retention basin 4: local protection 5: maximum-sized retention basin 6: combination of 3 and 4

risk reduction CHF/y % of initial risk

29’000

34

22’000

26

63’000

73

20’000

23

80’000

93

66’000

77

costs CHF/y
65’000 25’000 55’000 15’000 65’000 65’000

benefit / cost ratio
0.45 0.88 1.15 1.33 1.23 1.02

of changes in basic values by the user improves the comprehensible assessment of the results from the risk assessment. The case study “Chummerbach” demonstrated that the structured workflow led to comprehensible results. The final benefit-cost ratio depends on the assumptions and parameters in the risk assessment and the estimated effectiveness of mitigation measures. Examples from other studies indicated that the benefit-cost ratio can vary up to several factors due to changed values for vulnerability and mortality rate (Bru¨ndl et al., 2009). In the actual version of EconoMe the uncertainties of input data are not considered. It will be one of the next steps in the further development to integrate the uncertainties of parameters and to communicate the effects to the end-users.
A third reason, which might support the introduction and the application of instruments and guidelines into practice is simply that it is mandatory for new projects above an investment sum of ≥CHF 1 million, which forces all cantonal authorities to use EconoMe for economic assessment of mitigation projects. One year after the introduction of EconoMe over 300 projects could be found in the database (BAFU, 2009). The first experiences during the introduction of EconoMe to the community of natural hazard practitioners indicate that practitioners start only to deal with risk based decision making when they were obliged to.
Last but not least, every innovation or new technology takes some time for being applied. The guideline for regarding avalanche hazard in land use planning in Switzerland was published in 1984 (BFF and SLF, 1984) and those for integrating flood and mass movement hazard into land use planning in 1997 (Loat and Petrascheck, 1997; Lateltin et al., 1997). The state of hazard mapping in Switzerland on January 2008 shows that for 50% of the potential avalanche endangered areas hazard maps are existing and integrated into land use planning. However, this holds only for 20% of the areas endangered by floods and mass movements (BAFU, 2008). This comparison supports the statement of White et al. (2001) that long-term improvements in natural hazard management could be observed only over decades. Although their observations mainly refer to the situation in the United States, we can expect that the integration of the risk concept

into the natural hazard management practice in Switzerland will also take some more years.
With the development of the guideline RIKO and the software tool EconoMe, a knowledge exchange process was initiated among scientists and practitioners with both groups being integrated in the development process. During the introduction of EconoMe by education courses, some potential for improvements and removing of teething troubles was detected. It soon became clear that EconoMe significantly contributed to the implementation of the risk concept into practice. The fact that it is mandatory for projects with an investment of ≥CHF 1 million ensures that practitioners have to deal with the application of the risk concept. The use of EconoMe in their daily work helps also to improve the tool by practical experiences. Therefore, it is necessary that knowledge between developers and users are regularly exchanged. This, and the integration of new functionalities into EconoMe (like e.g., an illustration of uncertainties and the integration of spatial information using GIS-techniques) will pave the way for an improved, widely accepted tool for the risk-based planning and evaluation of mitigation projects.
The goal of introducing the risk concept as a management basis for dealing with natural hazards was to optimize the allocation of financial resources. The argumentation for a priorisation of mitigation measures in certain regions becomes comprehensible when they are based on comparable risk assessments. The architecture and the workflow in EconoMe with pre-defined factors for calculation allows that results provided by different users can be better compared, although uncertainties especially concerning the hazard assessment still remain. The application of the workflow of EconoMe illustrated by the case study Chummerbach indicated that the decision on the realisation of mitigation measures becomes more obvious. However, results can be misleading when they are produced by insufficiently qualified users. This undesired effect could be addressed by requiring that only persons, who have passed certain education courses, are permitted to evaluate mitigation projects with EconoMe.
Cost-benefit and cost-effectiveness analysis have become state-of-the-art for evaluating mitigation measures against natural hazards in many countries (see e.g., Whalen et al.,

Nat. Hazards Earth Syst. Sci., 9, 801–813, 2009

www.nat-hazards-earth-syst-sci.net/9/801/2009/